{"id":13686,"date":"2022-09-02T09:31:08","date_gmt":"2022-09-02T09:31:08","guid":{"rendered":"https:\/\/ingenieriamasred.com\/legalization-of-solar-photovoltaic-self-consumption-in-formentera\/"},"modified":"2026-01-26T10:54:44","modified_gmt":"2026-01-26T10:54:44","slug":"legalization-of-solar-photovoltaic-self-consumption-in-formentera","status":"publish","type":"post","link":"https:\/\/ingenieriamasred.com\/en\/legalization-of-solar-photovoltaic-self-consumption-in-formentera\/","title":{"rendered":"Legalization of solar photovoltaic self-consumption in Formentera"},"content":{"rendered":"<p id=\"viewer-foo\" class=\"mm8Nw _1j-51 roLFQS _1FoOD _78FBa sk96G9 roLFQS public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"_2PHJq public-DraftStyleDefault-ltr\">Are you from Formentera and thinking about saving on your electricity bill with a photovoltaic self-consumption installation? In this article, we&#8217;ll explain the requirements for your project.<\/span><\/p>\n<h2 id=\"viewer-coo3\" class=\"eSWI6 _1j-51 _1FoOD _78FBa sk96G9 roLFQS public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"_2PHJq public-DraftStyleDefault-ltr\"><strong><em>What are the conditions for a photovoltaic self-consumption installation?<\/em><\/strong><\/span><\/h2>\n<p id=\"viewer-7jelh\" class=\"mm8Nw _1j-51 roLFQS _1FoOD _3M0Fe Z63qyL roLFQS public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"_2PHJq public-DraftStyleDefault-ltr\">Depending on the type of soil on which the self-consumption solar installation will be installed in Formentera, we consider the following cases:<\/span><\/p>\n<ul class=\"public-DraftStyleDefault-ul\">\n<li id=\"viewer-2ag1h\" class=\"roLFQS ULPWlI _3Kjjs public-DraftStyleDefault-unorderedListItem public-DraftStyleDefault-depth0 public-DraftStyleDefault-list-ltr fixed-tab-size public-DraftStyleDefault-reset _1FoOD _3M0Fe Z63qyL roLFQS\">\n<p class=\"_1j-51 _1FoOD _3M0Fe Z63qyL roLFQS\"><strong>Urban land<\/strong>, where installation may be carried out on building roofs, with prior notification, except for buildings of cultural interest, which require an environmental impact assessment, or whose installation affects the foundations\/structure of the building.<\/p>\n<\/li>\n<li class=\"roLFQS ULPWlI _3Kjjs public-DraftStyleDefault-unorderedListItem public-DraftStyleDefault-depth0 public-DraftStyleDefault-list-ltr fixed-tab-size public-DraftStyleDefault-reset _1FoOD _3M0Fe Z63qyL roLFQS\">\n<p class=\"_1j-51 _1FoOD _3M0Fe Z63qyL roLFQS\"><strong>Rustic land<\/strong>, where the installation may be carried out as long as the occupation is less than 15 hectares.<\/p>\n<\/li>\n<\/ul>\n<p id=\"viewer-1b6o\" class=\"mm8Nw _1j-51 roLFQS _1FoOD _3M0Fe Z63qyL roLFQS public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\">Once the soil type has been identified, solar panels may only be installed on buildings with flat roofs or on the ground surrounding such buildings, provided that they are not visible from the outside in either case.<\/p>\n<ol class=\"public-DraftStyleDefault-ol\">\n<li id=\"viewer-5edv6\" class=\"roLFQS _2ULPL _78FBa public-DraftStyleDefault-orderedListItem public-DraftStyleDefault-depth0 public-DraftStyleDefault-list-ltr fixed-tab-size public-DraftStyleDefault-reset _1FoOD _78FBa sk96G9 roLFQS\">\n<p class=\"_1j-51 _1FoOD _78FBa sk96G9 roLFQS undefined\">In the case of <strong>solar panels<\/strong> on roofs, they cannot be installed on pitched roofs. And in the case of flat roofs:<\/p>\n<\/li>\n<li class=\"roLFQS _2ULPL _78FBa public-DraftStyleDefault-orderedListItem public-DraftStyleDefault-depth0 public-DraftStyleDefault-list-ltr fixed-tab-size public-DraftStyleDefault-reset _1FoOD _78FBa sk96G9 roLFQS\">\n<p class=\"_1j-51 _1FoOD _78FBa sk96G9 roLFQS undefined\">They will have a maximum slope of <strong>10%<\/strong>, protected by railings of a maximum height of 60 cm around their entire perimeter.<\/p>\n<\/li>\n<li class=\"roLFQS _2ULPL _78FBa public-DraftStyleDefault-orderedListItem public-DraftStyleDefault-depth0 public-DraftStyleDefault-list-ltr fixed-tab-size public-DraftStyleDefault-reset _1FoOD _78FBa sk96G9 roLFQS\">\n<p class=\"_1j-51 _1FoOD _78FBa sk96G9 roLFQS undefined\">In the case of <strong>solar panels<\/strong> on the ground,<\/p>\n<\/li>\n<li class=\"roLFQS _2ULPL _78FBa public-DraftStyleDefault-orderedListItem public-DraftStyleDefault-depth0 public-DraftStyleDefault-list-ltr fixed-tab-size public-DraftStyleDefault-reset _1FoOD _78FBa sk96G9 roLFQS\">\n<p class=\"_1j-51 _1FoOD _78FBa sk96G9 roLFQS undefined\">The maximum gradient will be <strong>20%<\/strong> and also:<\/p>\n<\/li>\n<li class=\"roLFQS _2ULPL _78FBa public-DraftStyleDefault-orderedListItem public-DraftStyleDefault-depth0 public-DraftStyleDefault-list-ltr fixed-tab-size public-DraftStyleDefault-reset _1FoOD _78FBa sk96G9 roLFQS\">\n<p class=\"_1j-51 _1FoOD _78FBa sk96G9 roLFQS undefined\">The <strong>occupation<\/strong> must be less than the difference between the surface area of \u200b\u200bthe building and the roof area of \u200b\u200bsaid building occupied by slabs, and may not exceed 100 m2.<\/p>\n<\/li>\n<li class=\"roLFQS _2ULPL _78FBa public-DraftStyleDefault-orderedListItem public-DraftStyleDefault-depth0 public-DraftStyleDefault-list-ltr fixed-tab-size public-DraftStyleDefault-reset _1FoOD _78FBa sk96G9 roLFQS\">\n<p class=\"_1j-51 _1FoOD _78FBa sk96G9 roLFQS undefined\">The installation of <strong>photovoltaic panels<\/strong> must be protected by fences with a maximum ground clearance of 80 cm, taking into account the setbacks from adjacent buildings.<\/p>\n<\/li>\n<li class=\"roLFQS _2ULPL _78FBa public-DraftStyleDefault-orderedListItem public-DraftStyleDefault-depth0 public-DraftStyleDefault-list-ltr fixed-tab-size public-DraftStyleDefault-reset _1FoOD _78FBa sk96G9 roLFQS\">\n<p class=\"_1j-51 _1FoOD _78FBa sk96G9 roLFQS undefined\"><strong>Support systems<\/strong> must be installed on unpaved ground.<\/p>\n<\/li>\n<\/ol>\n<h2 id=\"viewer-969em\" class=\"eSWI6 _1j-51 _1FoOD _78FBa sk96G9 roLFQS public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\">Example of photovoltaic solar installation<\/h2>\n<p id=\"viewer-95o48\" class=\"mm8Nw _1j-51 roLFQS _1FoOD _78FBa sk96G9 roLFQS public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\">We&#8217;ve attached a link to an example of a <a href=\"https:\/\/ingenieriamasred.com\/en\/solar-panels\/\">solar self-consumption installation<\/a> that meets the requirements.<\/p>\n<h2 id=\"viewer-3i2in\" class=\"eSWI6 _1j-51 _1FoOD _78FBa sk96G9 roLFQS public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"_2PHJq public-DraftStyleDefault-ltr\"><strong><em>Contact us and request support for self-consumption installation in Formentera<\/em><\/strong><\/span><\/h2>\n<p id=\"viewer-1057f\" class=\"mm8Nw _1j-51 roLFQS _1FoOD _78FBa sk96G9 roLFQS public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><em>Do you have any more questions? Do you want to leap into photovoltaic self-consumption? <a href=\"https:\/\/ingenieriamasred.com\/en\/contact\/\">Ask our experts<\/a>. At MASRED Engineering, we&#8217;re here to answer your questions and provide support throughout the entire management and installation process, facilitating your transition to green energy.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Are you from Formentera and thinking about saving on your electricity bill with a photovoltaic self-consumption installation? In this article,<\/p>\n","protected":false},"author":1,"featured_media":12876,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_joinchat":[],"footnotes":""},"categories":[155],"tags":[],"class_list":["post-13686","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-grants-articles"],"acf":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/ingenieriamasred.com\/en\/wp-json\/wp\/v2\/posts\/13686","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ingenieriamasred.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ingenieriamasred.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ingenieriamasred.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ingenieriamasred.com\/en\/wp-json\/wp\/v2\/comments?post=13686"}],"version-history":[{"count":2,"href":"https:\/\/ingenieriamasred.com\/en\/wp-json\/wp\/v2\/posts\/13686\/revisions"}],"predecessor-version":[{"id":13875,"href":"https:\/\/ingenieriamasred.com\/en\/wp-json\/wp\/v2\/posts\/13686\/revisions\/13875"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ingenieriamasred.com\/en\/wp-json\/wp\/v2\/media\/12876"}],"wp:attachment":[{"href":"https:\/\/ingenieriamasred.com\/en\/wp-json\/wp\/v2\/media?parent=13686"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ingenieriamasred.com\/en\/wp-json\/wp\/v2\/categories?post=13686"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ingenieriamasred.com\/en\/wp-json\/wp\/v2\/tags?post=13686"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}